How Long Will My Bathroom Renovation Take?

One of the first questions homeowners ask—right after “how much will it cost?”—is:
“How long is my bathroom renovation going to take?”

As a contractor who focuses on bathrooms, I can tell you: timelines vary depending on the scope, level of customization, and how well the project is planned. Here's what you can expect for different types of bathroom projects:

Full Gut & Renovation

If you're starting from scratch—ripping everything down to the studs and installing all-new plumbing, electrical, tile, fixtures, and finishes—a full bathroom renovation typically takes 3 to 6 weeks.

That timeline can stretch longer if you're choosing custom vanities, imported tile, or luxury features like curbless showers, heated floors, or steam systems. Custom = more lead time for ordering and fitting.

Family Bathroom Demo and Gut

Partial Upgrades (New Flooring, Fixtures, or Cabinets)

For lighter updates where the layout remains the same, you’re likely looking at 1 to 2 weeks. This includes:

  • Swapping out vanities or toilets

  • Installing new flooring

  • Replacing lighting or mirrors

These jobs go faster—but still require planning to avoid delays from missing materials or fixture misfits.

Tub-to-Walk-In Shower Conversions

One of the most popular projects we do is converting an alcove tub to a walk-in shower. These are often chosen for accessibility, ease of cleaning, and style.

A standard tub-to-shower conversion generally takes 7 to 10 days, but can run longer if you’re:

  • Moving plumbing

  • Installing custom glass

  • Adding built-in niches or benches

Bathtub to Walk-In Shower Conversion

Why Planning Matters

Here’s the truth: the better you plan, the faster things go.
Delays usually happen when materials haven’t arrived on time or there’s a decision hold-up mid-reno.

We always recommend:

  • Finalizing design choices before demo starts

  • Ordering materials well in advance

  • Being available for quick decision-making during install

The Bottom Line

No two bathroom projects are the same—but with the right contractor and proper planning, your renovation can stay on schedule and stress-free.

Want a smoother experience from demo to done? Let’s talk early—and get it right from the start.