How Long Will My Bathroom Renovation Take?
One of the first questions homeowners ask—right after “how much will it cost?”—is:
“How long is my bathroom renovation going to take?”
As a contractor who focuses on bathrooms, I can tell you: timelines vary depending on the scope, level of customization, and how well the project is planned. Here's what you can expect for different types of bathroom projects:
Full Gut & Renovation
If you're starting from scratch—ripping everything down to the studs and installing all-new plumbing, electrical, tile, fixtures, and finishes—a full bathroom renovation typically takes 3 to 6 weeks.
That timeline can stretch longer if you're choosing custom vanities, imported tile, or luxury features like curbless showers, heated floors, or steam systems. Custom = more lead time for ordering and fitting.
Partial Upgrades (New Flooring, Fixtures, or Cabinets)
For lighter updates where the layout remains the same, you’re likely looking at 1 to 2 weeks. This includes:
Swapping out vanities or toilets
Installing new flooring
Replacing lighting or mirrors
These jobs go faster—but still require planning to avoid delays from missing materials or fixture misfits.
Tub-to-Walk-In Shower Conversions
One of the most popular projects we do is converting an alcove tub to a walk-in shower. These are often chosen for accessibility, ease of cleaning, and style.
A standard tub-to-shower conversion generally takes 7 to 10 days, but can run longer if you’re:
Moving plumbing
Installing custom glass
Adding built-in niches or benches
Why Planning Matters
Here’s the truth: the better you plan, the faster things go.
Delays usually happen when materials haven’t arrived on time or there’s a decision hold-up mid-reno.
We always recommend:
Finalizing design choices before demo starts
Ordering materials well in advance
Being available for quick decision-making during install
The Bottom Line
No two bathroom projects are the same—but with the right contractor and proper planning, your renovation can stay on schedule and stress-free.
Want a smoother experience from demo to done? Let’s talk early—and get it right from the start.